The application of the Pressure Equipment 97/23/EC to large scale complex installations has always been difficult, we have successfully assisted one of the worlds largest manufacturers in the US to deliver a full PED Compliance strategy, liaising with their chosen Notfied Body, and delivering a full compliance regime for an entire Power Station loacted in Ireland.
From this we further developed their CE Marking strategy for their mobile 300 Mwat power systems used across the globe, their sucess has been remarkable in demonstrating compliance of their system to some of the most stringent compliance authorities across the world.
Our client, one of the worlds largest engineering companies, was struggling with the implementation of the Pressure Equipment 97/23/EC
Atex Compliance
Equipment designed, and, where necessary, equipped with additional special means of protection affording a very high level of protection. For use in underground parts of mines as well as those parts of surface installations endangered by fire damp and/or combustible dust
DSEAR Quick Links
For quick navigation to sepecific areas of our site please use the links below
Home
Services
ATEX
ATEX Concepts
ATEX Guidance
DSEAR
DSEAR Site Surveys
Area Classification
DSEAR Guidance
DSEAR Videos
Training
ATEX Training
DSEAR Training
About Us
Contact Us
Resources
Articles
CE Marking
DSEAR Overview
EMC Compliance
CE Marking Directives
Links
Search Engine
Sitemap